In recent years, the Floating Foundations as new foundations concept in which the WTG tower is connected directly to the central column. Product Range and Capacity Diameter: up to 15 m Wall thickness: up to 197 mm Height: up to 40 m Weight: up to 2,500 ton for each Floating Column Capacity: 10,000 ton per […]
The Suction Bucket component is a part of the suction bucket Jacket – also known as caisson, it is fast becoming a popular foundation where seabed conditions allow. Product Range and Capacity Diameter: up to 15 m Wall thickness: up to 197 mm Length: up to 20 m Capacity: 5,000 ton per month
The Upper Jacket is the middle part of the jacket wind foundation. The Lower Jacket is the bottom part of the jacket wind foundation. The Lower and Upper Jacket is called the support structure. The main function of the support structure is to transfer loads from the turbine to the ground, allow access to the […]
The Transition Piece is the top part of the jacket wind foundation. The transition piece transfers the loads and weight of the wind turbine tower and generator to the jacket support structure legs. In the transition piece, the work platform and boat landing area gives access for installation and maintenance of the wind turbine. Product […]